Sharon Escalante
TUALP Dynamic Test Facility
Attached you will find a technical note for the design of a dynamic test Facility for gas-lift valves.
This includes some changes in our original piping system and some new instruments which will be incorporated into the final installation.
The new facility includes three important aspects:
- Instrumentation
- Measurement
- Piping system
All are going to be discussed in the following pages. At the end, you will find the associated schematic diagrams for the new installation.
Download report (TUALP members only)